Service

Industrial data and analytics

Build the data path behind production reporting.

GTMI builds data models, pipelines, reporting stores and dashboards for manufacturing. We use approved source access and agree each measure with its operational owner.

Worked example

For operations, engineering, and data teams planning production reporting or an industrial analytics pipeline.

How production data reaches the reportApproved source access → reporting applications
  1. 01

    Capture

    PLC, SCADA, MES, historian

  2. 02

    Model

    Events, tags, metric definitions

  3. 03

    Serve

    APIs and reporting stores

  4. 04

    Use

    Dashboards and shift reports

Reporting access follows source-system approvals. Operational owners approve the metric and the decisions made from it.

What GTMI takes on

Data engineering and reporting in one scope

GTMI can build the data pipeline and reporting application, or deliver a specific part of that work. Work includes source inventories, tag and event models, transport, storage, calculations, access rules, and dashboard implementation. We first identify who or what will use the data and what the report must show. That determines the sources and interfaces needed within your manufacturing environment.

01

Industrial source models

Source inventories, tag and event definitions, identifiers, timestamps, and links to production context.

02

Pipelines and storage

MQTT and API transport, historian patterns, time-series data, and PostgreSQL reporting stores.

03

Reporting applications

Grafana and Power BI views for agreed production measures, OEE, shift reporting, and operational review.

04

Data operations

Data-quality checks, approved consumer access, refresh expectations, and documented support ownership.

The delivery work

Model the data and define its ownership

Source work can span PLC, SCADA, MES, historian, ERP, quality, and manual inputs. GTMI documents event meaning, timestamps, identifiers, calculation rules, and handling of missing or corrected records. We review metric definitions with the client’s operational owners and document the data-quality checks and responsibilities alongside the model. The resulting definition gives production reviewers a consistent basis for selecting the figures to use, comparing shifts and investigating a disputed result.

Implement a supported reporting path

Delivery can use MQTT or API transport, historian and time-series patterns, PostgreSQL stores, and Grafana or Power BI, depending on the environment. For execution systems, the design uses approved read-only interfaces or API boundaries and separate analytics storage where required. GTMI implements the agreed pipeline and reporting views, checks them against source records, and documents refresh, access, and support responsibilities.

Data and reporting deliverables

  • Source inventory and approved metric definitions
  • Tag, event, and reporting data models
  • Implemented pipelines and consumer access
  • Reporting views and operating documentation

Platforms

  • PostgreSQL
  • TimescaleDB
  • InfluxDB
  • MQTT
  • Grafana
  • Power BI

Illustrative example: fictional manufacturing data

A shift that crosses midnight

The fictional assembly shift runs from 22:00 on 3 April to 06:00 on 4 April 2030, in UTC. A calendar-day extract misses the first two hours. A different exclusion rule changes the denominator again.

Measure definition and source
Definition fieldReporting rule
MeasureAvailability: running minutes divided by scheduled production minutes
SourceFictional timestamped line stop/start events and the shift schedule
Shift boundary22:00 to 06:00 UTC; assign the full shift to its start date
ExclusionsSubtract the scheduled 30-minute break from production minutes
CorrectionsRetain the original event, reason and reviewer for each correction; mark reports provisional until reviewed
Sample statusNo missing events or corrections in this dataset; assumes the line ran between the listed stops
Fictional stop events
EventUTC intervalMinutes
1. Unplanned stop22:40 to 23:0525
2. Planned break00:15 to 00:4530
3. Unplanned stop02:10 to 02:3020
Same events, different reporting definitions
ViewRunning / denominatorAvailability
Full shift, planned break excluded405 / 450 min90.0%
Calendar extract, 00:00 to 06:00 only310 / 330 min93.9%
Full shift, planned break included405 / 480 min84.4%

The full shift contains 480 minutes, a 30-minute planned break and 45 minutes of unplanned stops: 405 running minutes. The differences above come from the time boundary and exclusion rule, not changed production. An agreed definition tells the review team which figure to use. This is availability only, not a complete OEE calculation.

Working together

Data design and reporting delivery

Start with an architecture package for a reporting requirement, or scope the implementation of its pipeline and views.

Engagement 01

Data architecture package

Source, model, transport, and access design for a named reporting requirement, ready for client review.

Engagement 02

Pipeline and reporting delivery

Implementation of the agreed data path and reporting views, including checks against the sources and handover.

Define the engagement

Scope the reporting or data work

Tell us which decision the report supports and why the figures are disputed or difficult to use. We can identify whether the work belongs in source capture, the measure definition, the pipeline or the reporting view. Existing reports and source samples can follow later.

Contact GTMI

Tell us briefly what you need help with. We can discuss the details and agree the next step. Supporting documents are optional and can wait until that conversation.

Prefer email or phone? Email GTMI or call +34 858 23 50 22

Your enquiry

GTMI stores submitted details in its Frappe CRM. Cloudflare hosts this form and checks for automated submissions. Do not submit confidential manufacturing or sensitive personal information through this form. Read the Privacy Policy.